MODULE TOPICTurn maintenance demand into controlled work

S2C 202 · PREVENT

How does preventive maintenance stay on cycle?

Preventive maintenance starts from an installed asset, service commitment, or internal reliability objective—not from a customer complaint. Its purpose is to create due work early enough to plan it safely and economically.

PREVENTIVE CYCLE

Generate, plan, execute, and reschedule

Technical objectMaintenance planDue callOrder and capacityConfirmationNext due date
TRIGGER

Choose the right basis

Use time, meter/counter, condition, inspection result, or strategy package according to the failure pattern and service promise.

Plan capacity →
PREPARE

Release executable work

Attach task steps, skills, permits, parts, access windows, and required capacity before releasing the call to the team.

Plan the work →
CONTROL

Measure compliance and risk

Track due, overdue, deferred, completed, and missed work alongside production or customer-service impact.

Improve the cycle →
Customer contract PM

The maintenance call is an obligation to the customer. Completion may consume contract entitlement or create a billable service event.

Internal PM

The maintenance call protects company assets. The financial result is normally cost, asset availability, and settlement—not customer revenue.

Condition-led PM

An inspection or monitored condition changes the timing of work; the decision and evidence must remain traceable.

Example

A quarterly inspection finds a degrading motor vibration reading. The next service is advanced, a specialist and bearing kit are reserved, and the confirmation resets the relevant maintenance evidence.

CONTINUE THE PATHSeparate internal work from customer billing

Internal servicing uses the same planning discipline but has a different receiver, accounting path, and success measure.

Open internal service