505
LIVE PROJECTMove from stocking strategy to stable service and inventory control

MTS 505 · IMPLEMENTATION WALKTHROUGH

How does a Make to Stock implementation unfold?

Build the MTS operating model around one connected reality: a forecast can drive replenishment, but only executable production and available stock can support a customer promise.

  1. 01

    Discover

    Establish the stocking strategy: forecast ownership, service target, inventory-risk appetite, representative materials, plants, channels, and seasonal or lifecycle exceptions. Decide which outcomes matter: stockout, service, excess, ageing, forecast error, or production variance.

    Exit evidence: approved MTS scope, material families, demand and inventory owners, service/inventory measures, baseline performance, and known risks.

  2. 02

    Design

    Connect the complete MTS chain: forecast/PIR strategy → consumption → MRP → capacity and production → common stock → ATP → fulfilment → Finance hand-offs. Make the forecast, capacity, confirmation, stock-status, and period-end decisions explicit.

    Exit evidence: signed process and decision map, strategy and consumption rationale, replenishment and scheduling assumptions, ATP/service policy, stock model, Finance hand-offs, and exception ownership.

  3. 03

    Build & Prove

    Configure the smallest complete MTS scenario and run it end to end. Reconcile forecast demand, MRP proposal, capacity/scheduling feasibility, production execution, stock receipt, customer consumption/confirmation, and accounting outcome.

    Exit evidence: working representative material/plant, configuration and transport record, connected normal-flow proof, at least one controlled exception, and reconciled demand, stock, production, and finance evidence.

  4. 04

    Validate & Deploy

    Test volume and exception behaviour, then prepare the operating data and controls: master data, PIRs, jobs, interfaces, inventory/cutover treatment, roles, monitoring, and go/no-go reconciliation.

    Exit evidence: passed volume/exception tests, defect decisions, master-data and PIR readiness, job/interface checks, cutover runbook, opening stock and open-supply reconciliation, and named owners.

  5. 05

    Stabilize & Improve

    Operate the MTS feedback loop. Review forecast error, stockouts, excess and ageing, service level, production variance, rescheduling, and parameter corrections; distinguish policy, data, execution, and system causes before changing settings.

    Exit evidence: KPI cadence, exception queue and root-cause evidence, approved parameter corrections, support ownership, and a verified first planning/production cycle.

THE CONNECTING CONTROL

Do not promise availability from inventory the business cannot replenish or explain.

The stocking policy must survive forecast release, MRP, capacity/scheduling, production, ATP, fulfilment, cutover, and daily improvement.

CONTINUE THE PATHContinue to MTS 606

Move from implementation evidence into production diagnosis, ownership, and continuous improvement.

Open production support