B2A 202 · STRUCTURE

How should the capital project be structured?

Choose WBS-only, network-driven, maintenance-order-supported, or mixed execution without confusing the business outcome with one SAP object.

READ THE CAPABILITY

Choose a structure that can carry work and accountability

Project structure is the translation layer between an approved investment and executable work. WBS elements create accountable scope and cost boundaries; networks and activities add sequence, dates, resources, components, and confirmation detail when the build needs it.

The right design is the smallest structure that can answer the required control questions. A WBS-only build can be sufficient for responsibility and budget, while a network-driven or mixed pattern is justified when dependencies, progress, or technical execution must be planned and evidenced.

WORKING FLOW

From business decision to controlled evidence

Follow the capability through the records and decisions that make the result explainable.

01STEP 01

Define delivery packages

Break the approved outcome into responsible work packages, milestones, locations, and acceptance boundaries.

02STEP 02

Select execution depth

Choose WBS-only, networks, maintenance orders, or a mixed pattern based on scheduling and technical work needs.

03STEP 03

Assign control objects

Align cost collection, procurement, status, dates, responsibility, and settlement relevance to the structure.

04STEP 04

Baseline and govern change

Approve the plan, monitor progress and forecast, and preserve an auditable change path when scope moves.

DIAGNOSTIC EVIDENCE

What should be traceable?

When the result looks wrong, start with the last trusted record and follow the owning boundary.

STRUCTURE

Project profile, WBS hierarchy, network/activity design, responsible owner, location, and status rules.

PLAN

Dates, dependencies, milestones, planned cost, resource or material assumptions, and approved baseline.

CONTROL

Progress, forecast, commitments, actual cost, change decision, and impact on delivery and capitalization.

SCENARIO

A plant expansion needs both accountability and sequence

The project uses WBS elements for civil works, utilities, and equipment packages, then adds networks only where installation dependencies and confirmations matter. This keeps budget and settlement responsibility clear without forcing every work package into the same scheduling depth.

  • Business rule and accountable owner are explicit
  • SAP object and source evidence remain connected
  • Exception or outcome is reconciled before closure

CORE MODEL

Three questions to resolve

A sound design makes ownership, control, and evidence explicit before configuration.

CONTINUE THE PATHContinue to B2A 303

See how this capability changes across valid integration models.